VALIDATION OF FERROL AND CALASPARRA PILOTS

The action of validation of LIFE DrainRain pilots will be completed this September. Over this validation, the performance of the pilot 1, located in Ferrol seaport (Galicia), has been evaluated for more than 25 months of operation between September 2019 and June 2022. The performance of pilot 2, located in RM-714 road of Calasparra (Murcia), […]

Read More »
7TH MONITORING MEETING (SEPTEMBER’22)

On September 14th, the follow-up visit to the LIFE DrainRain project by the Neemo Technician, the Project Adviser and staff from the National Focal Point of the LIFE Program took place. As part of the follow-up visit, the demonstrator No. 1 of the LIFE Project DrainRain located in the Port of Ferrol was inspected. Located […]

Read More »
VALIDATION OF FERROL AND CALASPARRA PILOTS

The performance of LIFE DrainRain pilots located in the seaport of Ferrol (Galicia) and RM-714 road of Calasparra (Murcia) has been evaluated since 2019 and 2020, respectively. For this end, samples have been taken periodically in different meteorological conditions, having information in both rainy and drought events. Moreover, the efficiency of each module in both […]

Read More »